Equipment is the second-largest cost on most construction projects — and the one most contractors don't allocate correctly. Here's how to track it properly.

◆
By Viviana Ferj, CPA — 40 years as an accountant, 35 years in construction
Equipment cost allocation on construction site

The Most Misunderstood Cost in Construction

Equipment is the second-largest cost on most construction projects — after labor. But unlike labor, equipment costs are often poorly tracked and misallocated.

Many contractors treat equipment as a fixed cost — just another overhead expense. But equipment should be treated as a variable cost, allocated to the jobs that actually use it. When equipment costs are misallocated, job profitability is distorted — and you make decisions based on bad data.

Equipment sitting idle is overhead. Equipment working is a job cost.

The True Cost of Equipment

The true cost of equipment includes more than just the purchase price. The full cost includes:

  • Depreciation: The gradual loss of value over time.
  • Fuel: The cost of fuel to operate the equipment.
  • Maintenance and repairs: Regular maintenance and unexpected repairs.
  • Insurance: The cost to insure the equipment.
  • Financing costs: Interest on equipment loans.
  • Transportation: Cost to move equipment between jobs.
  • Operator costs: If the equipment requires an operator.
Heavy equipment cost tracking on job site

The Equipment Cost Allocation Problem

Many contractors allocate equipment costs by total hours used — but that doesn't account for differences in the cost of different pieces of equipment.

Consider:

  • An excavator costs $500,000 and costs $150/hour to operate.
  • A skid steer costs $50,000 and costs $50/hour to operate.

If you allocate by hours alone, you may undercharge the excavator on a job — or overcharge the skid steer. The correct approach is to allocate by equipment-specific cost per hour.

Excavator versus skid steer cost per hour comparison

The Cost of Misallocation: A Numerical Example

Suppose you have two excavators and two jobs:

  • Job A: Uses the large excavator for 100 hours at $150/hour = $15,000.
  • Job B: Uses the small excavator for 100 hours at $75/hour = $7,500.

If you allocate by hours alone, you'd allocate $11,250 to each job — charging Job A less than it should be and Job B more. Job A's margin looks better than it is; Job B's margin looks worse. And you're making decisions based on distorted data.

Numerical example of equipment cost misallocation between two jobs

How to Allocate Equipment Costs Correctly

  • Calculate equipment-specific cost per hour: Include depreciation, fuel, maintenance, insurance, and financing.
  • Track equipment hours by job: Use equipment tracking software or log sheets to track hours per job.
  • Allocate costs based on hours: Multiply hours used by the equipment-specific cost per hour.
  • Review allocation regularly: Update cost per hour as equipment ages and costs change.
  • Incorporate allocation into job costing: Equipment costs should flow into your job costing system just like labor and materials.

The Impact of Equipment Cost Allocation on Bonding

When a surety reviews your job profitability, they look at your equipment costs — and whether they're allocated correctly. Inconsistent equipment allocation suggests weak cost controls — which affects your bonding capacity.

Surety reviewing equipment cost allocation for bonding capacity

Frequently Asked Questions

What's the best way to track equipment hours?

Equipment tracking software — like GPS-based systems — is the most accurate. For smaller contractors, manual logs can work.

Should I include operator costs in equipment cost?

Yes — if the operator is dedicated to the equipment. If the operator is shared, allocate labor separately.

How often should I update equipment cost per hour?

At least annually, or whenever there's a significant change in fuel costs, maintenance, or depreciation.

Does equipment cost allocation affect taxes?

Yes — equipment costs allocated to jobs reduce job profitability, which affects taxable income.

Equipment Cost Allocation Construction Equipment Job Costing Heavy Equipment Cost Equipment Tracking Construction Accounting

Are Your Equipment Costs Allocated Correctly?

If you're not sure whether your equipment costs are accurate, let's talk — no strings attached.

Contact Us

Take This to a Full Diagnostic of Your Operation

Request a CFO Strategic Audit
In Summary

Equipment costs are the second-largest cost in construction — and the one most contractors don't track correctly. Getting it right is essential for job profitability.

A company can build a strong balance sheet, maintain a clean WIP Schedule, and run profitable jobs — but if equipment costs are misallocated, job margins are distorted. Contractors who track equipment costs correctly — calculating equipment-specific cost per hour, tracking hours by job, and allocating costs accurately — are the same ones who arrive at their next bonding negotiation with numbers that hold up under scrutiny. And they avoid, project after project, the unpleasant surprise of a job that looked profitable on paper but lost money because equipment costs were never properly allocated.

Viviana Ferj
Viviana Ferj, CPA
General Manager of Construcciones Ferj, Chile
Founder of VFERJ PROFIT
Content Creator
CPA · Auditing Accountant

Specialist in financial audits for construction companies in the USA, focused on real profitability per job, WIP Schedules, multi-state tax exposure, and bonding capacity.

40
Years as Accountant
35
Years in Construction
Monthly Newsletter

Get These Insights Straight to Your Inbox

A new article on construction finance every month — no spam, unsubscribe anytime.