Prequalification: What GCs Look at Before Hiring You

Before a general contractor hires you as a subcontractor, they'll put you through a prequalification process. Here's what they look for — and how to prepare.

◆
By Viviana Ferj, CPA — 40 years as an accountant, 35 years in construction
Construction prequalification approval on site

What Is Prequalification and Why Does It Matter?

Prequalification is the process by which a general contractor evaluates a subcontractor before awarding them a contract. It's designed to answer one question: "Can this subcontractor perform the work and complete it successfully?"

Prequalification matters because it's the gatekeeper to most commercial construction projects. If you're not prequalified, you can't bid. And if you can't bid, you can't grow.

Prequalification isn't optional — it's the price of entry to most commercial construction projects.

The Documents GCs Ask For

  • Financial statements: Balance sheet, income statement, and cash flow statement — audited or reviewed, if possible.
  • WIP Schedule: The most important document. GCs want to see that you track job profitability and manage over/under-billing.
  • Bonding capacity: A letter from your surety showing your current bonding capacity and backlog.
  • Insurance certificates: Proof of general liability, workers' compensation, and other required coverage.
  • Project list: A list of completed and current projects, including contract values and references.
  • Organizational chart: A chart showing your key personnel and their experience.
Prequalification documents for construction subcontractor

What GCs Look For in Your Financials

  • Working capital: Do you have enough cash to fund the project? A common benchmark is working capital equal to 5% to 10% of your annual volume.
  • Job profitability: Are your job margins consistent? Wildly fluctuating margins suggest inconsistent estimating or job management.
  • Debt levels: Are you over-leveraged? Excessive debt is a red flag.
  • Liquidity: Do you have access to cash or a line of credit?
GC reviewing subcontractor financials for prequalification

What GCs Look For in Your WIP Schedule

  • Consistency: Do you prepare your WIP Schedule monthly? Gaps suggest a lack of discipline.
  • Over/Under-Billing: Are your jobs balanced, or are you consistently over-billed or under-billed? Both extremes are concerns.
  • Profit fade: Are job margins staying consistent, or are they declining over time? Declining margins suggest poor job management.
  • Change orders: Are change orders being billed promptly, or are they accumulating unbilled?
WIP Schedule review during subcontractor prequalification

The Red Flags GCs Look For

  • Gaps in the WIP Schedule: Missing months suggest you're not reviewing your jobs regularly.
  • Negative working capital: If your current liabilities exceed your current assets, you're at risk.
  • High AR aging: AR over 90 days suggests collection problems.
  • Frequent subcontractor defaults: A history of defaults suggests poor subcontractor management.
  • Insurance lapses: Even a single lapse in coverage is a serious red flag.

How to Prepare for Prequalification

  • Clean up your financials: Review your financial statements for accuracy. Pay down debt where possible.
  • Update your WIP Schedule: Make sure it's current and accurate. Address any problem jobs before the GC sees them.
  • Review your insurance: Ensure all coverage is current and adequate for the project size.
  • Prepare your references: Have a list of recent projects with contact information for references.
  • Be proactive: Don't wait for the GC to ask for documents — have them ready.
Prequalification red flags in construction

Frequently Asked Questions

How long does the prequalification process take?

It varies — anywhere from a few days to several weeks, depending on the GC's process and the completeness of your documentation.

Can I bid on a project if I'm not prequalified?

Usually not. Most GCs require prequalification before you can submit a bid.

What if I fail prequalification?

Ask the GC why. Understand the gaps and work to address them before the next opportunity.

Can I be prequalified by multiple GCs at once?

Yes — many subcontractors are prequalified by multiple GCs. In fact, it's a sign of credibility.

Prequalification GC Prequalification Subcontractor Prequalification Construction Bidding Bonding Capacity WIP Schedule

Is Your Prequalification Package Ready?

If you're not sure whether you'll pass prequalification, let's talk — no strings attached.

Contact Us

Take This to a Full Diagnostic of Your Operation

Request a CFO Strategic Audit
In Summary

Prequalification is the gatekeeper to commercial construction. If you're not prepared, you won't get through the gate.

A company can build a strong balance sheet, maintain a clean WIP Schedule, and run profitable jobs — but if the prequalification package is incomplete or inconsistent, the GC will move on to the next subcontractor. The discipline of preparing for prequalification well in advance, keeping financials clean, and maintaining a current WIP Schedule is what separates subcontractors who win work from those who are perpetually on the outside looking in. Contractors who treat prequalification with the seriousness it deserves are the same ones who arrive at the bidding table with confidence — and who leave with contracts that grow their business.

Viviana Ferj
Viviana Ferj, CPA
General Manager of Construcciones Ferj, Chile
Founder of VFerj Profit Systems
Content Creator
CPA · Auditing Accountant

Specialist in financial audits for construction companies in the USA, focused on real profitability per job, WIP Schedules, multi-state tax exposure, and bonding capacity.

40
Years as Accountant
35
Years in Construction
Monthly Newsletter

Get These Insights Straight to Your Inbox

A new article on construction finance every month — no spam, unsubscribe anytime.